Recommendations before building

NAKHRA BY HEMWARA.CO.LTD

Guidance from HEMWARA CO., LTD. for anyone planning to fill land before construction

01

Intended use of the filled plot

Fill to suit the purpose — house, building or factory. Check the city plan first.
02

Waiting time after fill before building

Ordinary fill: wait 6–12 months

Compacted fill: wait 1–3 months, or build immediately if piles are used

03

Land-fill budget

About 150–500 THB/cu.m., depending on soil type and fill height.

04

Level relative to the existing site

Fill about 30–50 cm above the road and check drainage.

FAQ

Frequently asked questions

Which fill soil should I use?

It depends on the purpose. Topsoil is for planting (290 THB/cu.m.). General fill soil is a lower-cost fill (240 THB/cu.m.). Hard soil / lateritic clay is for fill then building immediately, roads or riverside land (250 THB/cu.m.).

How long after filling before building a house?

Ordinary fill: wait 6–12 months. Compacted fill: wait 1–3 months, or build immediately if piles are used.

Do you deliver?

Yes. Fast delivery by land and water across Central Thailand, up to 2,500 cu.m. per day.

Do you do land-filling contracts?

Yes — clearing, grading, fill, urgent jobs, machinery ready, plus land filling and landscaping.