RECOMMEND
Recommendations before building
NAKHRA BY HEMWARA.CO.LTD
Guidance from HEMWARA CO., LTD. for anyone planning to fill land before construction
Waiting time after fill before building
Ordinary fill: wait 6–12 months
Compacted fill: wait 1–3 months, or build immediately if piles are used
Land-fill budget
About 150–500 THB/cu.m., depending on soil type and fill height.
Level relative to the existing site
Fill about 30–50 cm above the road and check drainage.
FAQ
Frequently asked questions
Which fill soil should I use?
It depends on the purpose. Topsoil is for planting (290 THB/cu.m.). General fill soil is a lower-cost fill (240 THB/cu.m.). Hard soil / lateritic clay is for fill then building immediately, roads or riverside land (250 THB/cu.m.).
How long after filling before building a house?
Ordinary fill: wait 6–12 months. Compacted fill: wait 1–3 months, or build immediately if piles are used.
Do you deliver?
Yes. Fast delivery by land and water across Central Thailand, up to 2,500 cu.m. per day.
Do you do land-filling contracts?
Yes — clearing, grading, fill, urgent jobs, machinery ready, plus land filling and landscaping.